The former Catherine Hill Bay coal preparation plant and coal stockpile areas were converted into a three-tiered recreational space to be enjoyed by the local communities. Brunette Engineering were contracted to fabricate almost 200 lineal metres of solid stainless-steel handrail to cover the perimeter of the structure, and the handrails of the steps. Each section of handrail was fabricated by our tradesmen and transported to site before they completed the final installation.
This was an incredible project to be involved in, we are excited to see the community enjoying this area.
Copyright © 2024 All Rights Reserved Brunette Engineering